H-E-B SA 03: 5,000 PSI Loading Dock Replacement

H-E-B SA 03: 1,2,3 Concrete project photo 1

A grocery store’s loading dock can’t close. Deliveries arrive all day and night.

ClientH-E-B (SA 03)
LocationSan Antonio, TX
DateMay 2021
Concrete5000 PSI
ReinforcementRebar @ 12 in. OCEW
Traffic plan8 × 12 ft steel road plates

In May 2021 we removed and replaced dock paving at H-E-B SA 03 using 5000 PSI concrete with rebar at 12 inches on center each way.

Keeping trucks moving

We laid 8 × 12 ft steel road plates over the work so delivery trucks could drive across right away while the new concrete gained strength underneath.