Tag: Loading Docks

  • H-E-B SA 03: 5,000 PSI Loading Dock Replacement

    H-E-B SA 03: 5,000 PSI Loading Dock Replacement

    A grocery store’s loading dock can’t close. Deliveries arrive all day and night.

    ClientH-E-B (SA 03)
    LocationSan Antonio, TX
    DateMay 2021
    Concrete5000 PSI
    ReinforcementRebar @ 12 in. OCEW
    Traffic plan8 × 12 ft steel road plates

    In May 2021 we removed and replaced dock paving at H-E-B SA 03 using 5000 PSI concrete with rebar at 12 inches on center each way.

    Keeping trucks moving

    We laid 8 × 12 ft steel road plates over the work so delivery trucks could drive across right away while the new concrete gained strength underneath.

    Request a quote for dock or truck-court paving.

    Project photos