Category: Commercial & Retail

  • San Marcos Outlets: Overnight Storefront Walkway Pour

    San Marcos Outlets: Overnight Storefront Walkway Pour

    On January 15, 2026 we poured a section of the covered storefront walkway at the San Marcos outlets. We set steel and placed concrete after hours so the stores could stay open.

    LocationSan Marcos, TX
    Pour dateJanuary 15, 2026
    ScopeCovered storefront walkway, rebar, night pour

    Retail concrete without the disruption

    Outlet centers depend on foot traffic. Night work lets us cut out old concrete, tie a fresh rebar mat and pour under lights, so shoppers find finished, barricaded sections the next morning instead of an active jobsite.

    • Rebar grid tied on chairs for proper cover
    • Concrete placed and screeded under temporary lighting
    • Edges finished tight to storefronts and columns
    • Area protected while it cures

    Planning work at a shopping center or retail property? Send us your scope. Night and weekend schedules are standard for us.

    Project photos

  • Wells Fargo: New Sidewalks and Main-Entrance ADA Ramp

    Wells Fargo: New Sidewalks and Main-Entrance ADA Ramp

    Just before Christmas 2024 we finished new sidewalks and a handicap ramp at the main entrance of a Wells Fargo branch.

    ClientWells Fargo
    CompletedDecember 23, 2024
    ScopeSidewalks, ADA ramp at main entrance

    Getting ADA work right

    Accessible ramps leave little room for error. Slope, cross-slope, landing size and transitions all have to meet ADA requirements, or the work gets torn out and redone. We form and check every ramp before the truck shows up.

    • Remove existing walks at the entrance
    • Form new sidewalks and the ramp to ADA slopes
    • Pour directly from the ready-mix truck
    • Broom finish for slip resistance

    Banks, offices and retail centers call us for ADA upgrades. Request a quote for your property.

    Project photos

  • H-E-B Fuel Station, Georgetown

    H-E-B Fuel Station, Georgetown

    In May 2024 our crew worked at the H-E-B fuel station in Georgetown, Texas.

    ClientH-E-B
    LocationGeorgetown, TX
    DateMay 2024

    Fuel stations are hard on concrete. Loaded tankers, constant traffic and fuel spills call for thick, well-reinforced paving and tight joint work. Work also has to be phased so pumps stay open to customers.

    We’ve completed paving, dock and entry work at H-E-B stores across Texas. See more commercial and retail projects or get a quote.

  • H-E-B Lockhart: Phase 1 Paving in a Four-Day Window

    H-E-B Lockhart: Phase 1 Paving in a Four-Day Window

    From January 15 through January 18, 2024, our crews completed Phase 1 of concrete work at H-E-B in Lockhart, Texas: demolition through finished paving, with the store open the whole time.

    ClientH-E-B
    LocationLockhart, TX
    DatesJanuary 15–18, 2024
    ScopeDemolition, subgrade, steel, paving

    The scope

    • Break out and haul off existing concrete
    • Prepare and compact the subgrade
    • Set forms and tie reinforcing steel
    • Place, finish and cure new paving

    Working around a live store

    Grocery work runs on the shopper’s schedule. We isolated and sequenced each section so customers and deliveries could keep moving while each area was demolished, poured and cured.

    Planning retail sitework? Request a quote.

    Project photos

  • QuikTrip: Overnight Demo, Next-Morning Pour-Back

    QuikTrip: Overnight Demo, Next-Morning Pour-Back

    Convenience stores never close, so concrete work has to fit into a single night. In May 2022 we completed four QuikTrip remove-and-replace jobs on back-to-back nights, then returned in November for demolition at North 1604/37 and Foster/I-10.

    ClientQuikTrip
    LocationsSan Antonio, incl. Marbach/1604, North 1604/37, Foster/I-10
    DatesMay & November 2022
    ScopeOvernight demolition, steel, pour-back

    How an overnight cycle works

    • 9 PM: barricade, saw-cut and break out the old concrete
    • Overnight: haul off spoils, prep base, tie steel
    • Morning: pour back and finish (the fourth job poured at 10 AM)
    • Protect and reopen as soon as the concrete allows

    Our first QT job was demolished the night of May 8 and poured May 9. The third, at Marbach and 1604, was demolished overnight on May 15. The fourth was demolished at 9 PM on May 16, with steel tied and pour-back at 10 AM on May 17.

    This kind of schedule takes our own equipment, an experienced crew and tight coordination with the ready-mix supplier. Talk to us about phasing your site.

    Project photos

  • H-E-B Kitty Hawk: Night Concrete Work

    H-E-B Kitty Hawk: Night Concrete Work

    In November 2022 we worked nights at H-E-B Kitty Hawk.

    ClientH-E-B
    LocationKitty Hawk, San Antonio area
    DateNovember 2022

    Doing grocery concrete at night keeps parking and entrances open to shoppers during the day. Our crews bring their own lighting and equipment and leave every section safe and barricaded before the store opens.

    More retail projects · Request a quote

    Project photos

  • H-E-B Rockport, Texas

    H-E-B Rockport, Texas

    In October 2022 our crew traveled to the Gulf Coast for concrete work at H-E-B in Rockport.

    ClientH-E-B
    LocationRockport, TX
    DateOctober 2022

    Coastal sites bring their own challenges: salt air, humidity and storm-season schedules. Paving joints have to be cut and sealed properly to keep water out of the base.

    We mobilize crews and equipment anywhere in Texas. See our service area or request a quote.

    Project photos

  • H-E-B CC7: New Freezer Foundation

    H-E-B CC7: New Freezer Foundation

    On June 1, 2022 we prepared a new freezer foundation at H-E-B CC7, and on June 2 we poured it.

    ClientH-E-B (store CC7)
    DatesJune 1–2, 2022
    ScopeNew freezer foundation

    Freezer and cooler foundations carry heavy, concentrated loads and have to be flat and level so the prefabricated box sets correctly. Elevations and anchor locations are checked before the pour.

    More foundation projects · Request a quote

    Project photos

  • Dorćol Distilling + Brewing Co.: Addition Foundation, Elevator Pit and Entry Steps

    Dorćol Distilling + Brewing Co.: Addition Foundation, Elevator Pit and Entry Steps

    For Dorćol Distilling + Brewing Co. we built the add-on foundation, flatwork and elevator pit for their expansion, then came back for new entry steps.

    ClientDorćol Distilling + Brewing Co.
    LocationSan Antonio, TX
    DatesOctober 2021 – April 2022
    ScopeAddition foundation, flatwork, elevator pit, entry steps

    Foundation pour

    Rain came and went for days, but the crew got the foundation ready, and on October 23, 2021 it was poured early in the morning. It was a long day of placing and finishing.

    Elevator pit

    Elevator pits are precision work. Wall dimensions, waterproofing details and embed locations have to match the elevator manufacturer’s drawings exactly.

    Entry steps

    In April 2022 we formed and poured the entry steps that finished off the project.

    Request a quote for your commercial foundation.

    Project photos

  • H-E-B Victoria: Main Entrance and Paving Replacement

    H-E-B Victoria: Main Entrance and Paving Replacement

    H-E-B in Victoria is a store we know well. We first worked there in spring 2019, came back in October 2021 to remove and replace concrete paving, and returned again in March 2022.

    ClientH-E-B (Victoria 3)
    LocationVictoria, TX
    Dates2019, October 2021, March 2022
    ScopePaving remove-and-replace, main entrance replacement

    Main entrance replacement, 2022

    From March 29 to March 30, 2022 we removed and replaced the concrete at the main entrance, the busiest spot on any grocery site. It took two days.

    Paving, 2021

    On October 11, 2021 the crew removed and replaced paving sections and had them ready to pour the same day.

    Repeat clients are the best measure of our work. Request a quote.