Dorćol Distilling + Brewing Co.: Addition Foundation, Elevator Pit and Entry Steps

Dorćol Distilling + Brewing Co.: 1,2,3 Concrete project photo 1

For Dorćol Distilling + Brewing Co. we built the add-on foundation, flatwork and elevator pit for their expansion, then came back for new entry steps.

ClientDorćol Distilling + Brewing Co.
LocationSan Antonio, TX
DatesOctober 2021 – April 2022
ScopeAddition foundation, flatwork, elevator pit, entry steps

Foundation pour

Rain came and went for days, but the crew got the foundation ready, and on October 23, 2021 it was poured early in the morning. It was a long day of placing and finishing.

Elevator pit

Elevator pits are precision work. Wall dimensions, waterproofing details and embed locations have to match the elevator manufacturer’s drawings exactly.

Entry steps

In April 2022 we formed and poured the entry steps that finished off the project.