Tag: Remove and Replace

  • Uresti Tax Office: Sidewalk Remove-and-Replace

    Uresti Tax Office: Sidewalk Remove-and-Replace

    In April 2026 our crew prepped and poured new concrete at the Uresti tax office, a busy public building where people come and go all day.

    LocationSan Antonio, TX
    Pour dateApril 2026
    ScopeDemolition, forming, steel, pour-back

    Scope

    • Saw-cut and break out the failed sidewalk and entry concrete
    • Haul off debris and prep the subgrade
    • Set forms and reinforcing steel
    • Place, finish and cure new concrete

    Public buildings can’t shut down for construction. We sectioned the work so visitors always had a clear, safe way in, and we left the site clean at the end of every shift.

    Government and agency projects are one of our core practice areas. See our public and government capabilities or request a quote for your facility.

    Project photos

  • H-E-B Lockhart: Phase 1 Paving in a Four-Day Window

    H-E-B Lockhart: Phase 1 Paving in a Four-Day Window

    From January 15 through January 18, 2024, our crews completed Phase 1 of concrete work at H-E-B in Lockhart, Texas: demolition through finished paving, with the store open the whole time.

    ClientH-E-B
    LocationLockhart, TX
    DatesJanuary 15–18, 2024
    ScopeDemolition, subgrade, steel, paving

    The scope

    • Break out and haul off existing concrete
    • Prepare and compact the subgrade
    • Set forms and tie reinforcing steel
    • Place, finish and cure new paving

    Working around a live store

    Grocery work runs on the shopper’s schedule. We isolated and sequenced each section so customers and deliveries could keep moving while each area was demolished, poured and cured.

    Planning retail sitework? Request a quote.

    Project photos

  • H-E-B Victoria: Main Entrance and Paving Replacement

    H-E-B Victoria: Main Entrance and Paving Replacement

    H-E-B in Victoria is a store we know well. We first worked there in spring 2019, came back in October 2021 to remove and replace concrete paving, and returned again in March 2022.

    ClientH-E-B (Victoria 3)
    LocationVictoria, TX
    Dates2019, October 2021, March 2022
    ScopePaving remove-and-replace, main entrance replacement

    Main entrance replacement, 2022

    From March 29 to March 30, 2022 we removed and replaced the concrete at the main entrance, the busiest spot on any grocery site. It took two days.

    Paving, 2021

    On October 11, 2021 the crew removed and replaced paving sections and had them ready to pour the same day.

    Repeat clients are the best measure of our work. Request a quote.

    Project photos

  • 3,000 sq ft Driveway Remove and Replace

    3,000 sq ft Driveway Remove and Replace

    From January 7 to January 12, 2022 we tore out and replaced a 3,000 square foot driveway at a large home.

    Area3,000 sq ft
    DatesJanuary 7–12, 2022
    Concrete3000 PSI, 5 in. thick
    Reinforcement3/8 in. rebar @ 12 in. OCEW
    FinishBroom

    Process

    • Demolish existing driveway and haul off spoils
    • Prep and compact the base
    • Set forms and tie 3/8-inch rebar at 12 inches each way
    • Place 3000 PSI concrete at 5 inches thick
    • Broom finish

    We poured it 5 inches thick instead of the usual 4, which gives it more strength for heavy vehicles and long driveways. Request a quote.

    Project photos

  • Pool Deck Remove and Replace

    Pool Deck Remove and Replace

    In October 2021 we tore out a worn pool deck and poured a new one.

    DateOctober 11, 2021
    Concrete3000 PSI, 4 in. thick
    Reinforcement6-gauge wire mesh
    FinishBroom
    • Remove existing deck without damaging the pool
    • Prep base and place 6-gauge wire mesh
    • Pour 3000 PSI concrete, 4 inches thick
    • Broom finish for wet-foot traction

    Pool decks get wet, sun-baked and hosed down all the time. Getting slopes away from the pool and a slip-resistant finish matters as much as strength. Request a quote.

    Project photos

  • Lock Away Storage, Culebra Road: Apron Replacement

    Lock Away Storage, Culebra Road: Apron Replacement

    On August 24, 2021 we removed and replaced a concrete apron at Lock Away Storage on Culebra Road.

    ClientLock Away Storage
    LocationCulebra Rd, San Antonio
    DateAugust 24, 2021
    ScopeApron remove and replace

    Aprons carry turning trucks and trailers every day. A failed one is a hazard and a liability. We sectioned the work so tenants kept access to their units.

    Request a quote.

    Project photos

  • H-E-B San Marcos: 8-Inch, 4000 PSI Drive and Parking Replacement

    H-E-B San Marcos: 8-Inch, 4000 PSI Drive and Parking Replacement

    In summer 2021 we replaced drive and parking lot concrete at H-E-B San Marcos in phases, starting in June and finishing on July 10.

    ClientH-E-B (San Marcos 01)
    LocationSan Marcos, TX
    DatesJune–July 2021
    Concrete4000 PSI, 8 in. thick
    Reinforcement#4 rebar @ 12 in. OCEW
    FinishBroom

    Built for heavy traffic

    • Remove and replace existing paving
    • 8-inch thick, 4000 PSI concrete
    • #4 rebar at 12 inches on center each way
    • Broom finish

    Phasing let the store keep most of its parking open while each section was demolished, poured and cured.

    Request a quote for your parking lot.

    Project photos

  • H-E-B San Antonio Stores: 8-Inch Paving Replacement

    H-E-B San Antonio Stores: 8-Inch Paving Replacement

    We’ve replaced paving at H-E-B stores across San Antonio since 2018, including H-E-B #4 in 2018 and SA 23 in early 2020.

    ClientH-E-B (SA 32, SA 23, #4)
    LocationSan Antonio, TX
    Dates2018–2021
    Concrete4000 PSI, 8 in. (SA 32)
    Reinforcement#4 rebar @ 12 in. OCEW

    H-E-B SA 32, July 2021

    • Remove and replace 800 sq ft
    • 4000 PSI concrete, 8 inches thick
    • #4 rebar at 12 inches on center each way
    • Haul spoils, place and broom finish

    See our 5,000 PSI loading dock at H-E-B SA 03, or request a quote.

    Project photos

  • H-E-B SA 03: 5,000 PSI Loading Dock Replacement

    H-E-B SA 03: 5,000 PSI Loading Dock Replacement

    A grocery store’s loading dock can’t close. Deliveries arrive all day and night.

    ClientH-E-B (SA 03)
    LocationSan Antonio, TX
    DateMay 2021
    Concrete5000 PSI
    ReinforcementRebar @ 12 in. OCEW
    Traffic plan8 × 12 ft steel road plates

    In May 2021 we removed and replaced dock paving at H-E-B SA 03 using 5000 PSI concrete with rebar at 12 inches on center each way.

    Keeping trucks moving

    We laid 8 × 12 ft steel road plates over the work so delivery trucks could drive across right away while the new concrete gained strength underneath.

    Request a quote for dock or truck-court paving.

    Project photos

  • Cheap Concrete Is Never Cheap: How to Compare Concrete Quotes

    Cheap Concrete Is Never Cheap: How to Compare Concrete Quotes

    We tear out and rebuild a lot of bad concrete installations. Removing and disposing of a failed job costs time and money, often more than doing it right the first time.

    TopicComparing concrete bids

    Compare quotes apples to apples

    When you get quotes for your next concrete job, check that every contractor includes the same steps:

    • Thickness: 4 inches minimum for walks and patios; 5 inches or more for driveways
    • Concrete strength: the PSI of the mix (we typically use 3000–5000 PSI)
    • Reinforcement: rebar size and spacing (e.g. 3/8 inch at 12 inches each way), not just “mesh”
    • Doweling: rebar drilled into existing concrete where new meets old
    • Base prep: vegetation and roots removed, soil compacted
    • Finish: broom, exposed aggregate, stamped or salt
    • Haul-off: whether debris disposal is included

    15 feet or 15,000 feet

    Whether it’s a sidewalk, a driveway or a parking lot, we serve commercial and residential customers. We also install decorative concrete for homes and businesses, and we take on specialty projects that need custom solutions.

    Get a detailed, line-item quote.