We started a TxDOT job in Sealy on August 30, 2021.

AgencyTxDOT
LocationSealy, TX
DatesAugust 30 – September 2021
ResultPassed TxDOT and third-party inspection

Building up the base

The job needed a tall compacted A2 base pad. By September 23 we were 6 feet up, with 3 more to go.

Inspection-ready

On September 16 we tied steel. The forms, embeds and reinforcement passed both TxDOT inspection and the third-party inspection, and the pour was set for September 17.

Passing on the first try keeps agency schedules on track. Send us your TxDOT or agency bid.