For Dorćol Distilling + Brewing Co. we built the add-on foundation, flatwork and elevator pit for their expansion, then came back for new entry steps.
| Client | Dorćol Distilling + Brewing Co. |
| Location | San Antonio, TX |
| Dates | October 2021 – April 2022 |
| Scope | Addition foundation, flatwork, elevator pit, entry steps |
Foundation pour
Rain came and went for days, but the crew got the foundation ready, and on October 23, 2021 it was poured early in the morning. It was a long day of placing and finishing.
Elevator pit
Elevator pits are precision work. Wall dimensions, waterproofing details and embed locations have to match the elevator manufacturer’s drawings exactly.
Entry steps
In April 2022 we formed and poured the entry steps that finished off the project.