In February 2022 we built two slabs a week apart, one in Selma and one in Floresville. Each took two days.
| Locations | Selma & Floresville, TX |
| Dates | February 1–2 and 7–8, 2022 |
| Concrete | 3000 PSI, 4 in. thick |
| Reinforcement | #3 rebar @ 12 in. OCEW |
| Finish | Broom |
Same spec, done right both times
- Remove grass and topsoil
- Set forms to grade
- Tie #3 rebar at 12 inches on center each way
- Place 3000 PSI concrete, 4 inches thick
- Broom finish
Rebar on a grid at 12 inches each way is the step budget installers skip, and it’s what keeps a slab from breaking apart over time. Get a quote for your slab.