  • Selma and Floresville: Two Slabs in One Week

    Selma and Floresville: Two Slabs in One Week

    In February 2022 we built two slabs a week apart, one in Selma and one in Floresville. Each took two days.

    LocationsSelma & Floresville, TX
    DatesFebruary 1–2 and 7–8, 2022
    Concrete3000 PSI, 4 in. thick
    Reinforcement#3 rebar @ 12 in. OCEW
    FinishBroom

    Same spec, done right both times

    • Remove grass and topsoil
    • Set forms to grade
    • Tie #3 rebar at 12 inches on center each way
    • Place 3000 PSI concrete, 4 inches thick
    • Broom finish

    Rebar on a grid at 12 inches each way is the step budget installers skip, and it’s what keeps a slab from breaking apart over time. Get a quote for your slab.