In summer 2021 we replaced drive and parking lot concrete at H-E-B San Marcos in phases, starting in June and finishing on July 10.
| Client | H-E-B (San Marcos 01) |
| Location | San Marcos, TX |
| Dates | June–July 2021 |
| Concrete | 4000 PSI, 8 in. thick |
| Reinforcement | #4 rebar @ 12 in. OCEW |
| Finish | Broom |
Built for heavy traffic
- Remove and replace existing paving
- 8-inch thick, 4000 PSI concrete
- #4 rebar at 12 inches on center each way
- Broom finish
Phasing let the store keep most of its parking open while each section was demolished, poured and cured.