Tag: Parking Lots

  • H-E-B San Marcos: 8-Inch, 4000 PSI Drive and Parking Replacement

    H-E-B San Marcos: 8-Inch, 4000 PSI Drive and Parking Replacement

    In summer 2021 we replaced drive and parking lot concrete at H-E-B San Marcos in phases, starting in June and finishing on July 10.

    ClientH-E-B (San Marcos 01)
    LocationSan Marcos, TX
    DatesJune–July 2021
    Concrete4000 PSI, 8 in. thick
    Reinforcement#4 rebar @ 12 in. OCEW
    FinishBroom

    Built for heavy traffic

    • Remove and replace existing concrete
    • 8-inch thick, 4000 PSI concrete
    • #4 rebar at 12 inches on center each way
    • Broom finish

    Phasing let the store keep most of its parking open while each section was demolished, poured and cured.

    Request a quote for your parking lot.

    Project photos

  • Chihuahua Street: Added Parking Spaces

    Chihuahua Street: Added Parking Spaces

    From July 14 to 22, 2021 we added parking spaces for a property on Chihuahua Street in San Antonio.

    LocationChihuahua St, San Antonio
    DatesJuly 14–22, 2021
    Reinforcement#4 rebar @ 18 in. OCEW
    JointsSL1 sealant
    FinishBroom

    Scope

    • Remove existing soil and compact the subgrade
    • Tie #4 steel at 18 inches on center each way
    • Place and broom finish
    • Install SL1 sealant at construction joints and existing joints
    • Clean up and haul off spoils

    It rained hard for four hours on pour day. We protected the fresh concrete and still delivered a clean finish.

    Request a quote.

    Project photos