Spring 2023 kept our crews busy at CPS Energy substations around San Antonio.
| Client | CPS Energy |
| Location | San Antonio area, TX |
| Dates | March–May 2023 |
| Scope | Storage foundations, water pond, Skyline substation pours |
Storage foundation
In March we formed and tied a large storage foundation with heavy rebar mats, then finished it in May. Substation foundations call for exact embed locations and elevations, because equipment arrives pre-built and has to bolt down perfectly.
Water pond
We also built a concrete water pond at a substation, with continuous reinforcement and watertight construction.
Two pours in one day at Skyline
On May 19, 2023 the crew made two separate pours at the CPS Skyline substation, keeping the job on schedule.
Utility work is the top tier of our capabilities. See our Seguin and Loop 410 substation work, or request a quote.