On June 1, 2022 we prepared a new freezer foundation at H-E-B CC7, and on June 2 we poured it.
| Client | H-E-B (store CC7) |
| Dates | June 1–2, 2022 |
| Scope | New freezer foundation |
Freezer and cooler foundations carry heavy, concentrated loads and have to be flat and level so the prefabricated box sets correctly. Elevations and anchor locations are checked before the pour.
More foundation projects · Request a quote
Project photos








