  • Laughlin AFB Main Entrance Road: 8-Inch Concrete Reconstruction, Phase 1

    Laughlin AFB Main Entrance Road: 8-Inch Concrete Reconstruction, Phase 1

    The main commercial entrance to Laughlin Air Force Base carries delivery trucks, contractors and base traffic every day. 1,2,3 Concrete is on site in Del Rio, Texas, rebuilding this entrance road in phases, from subgrade preparation through final grade and the 8-inch concrete pour. Phase 1 covers 600 linear feet, 12 feet wide.

    ProjectMain commercial entrance road reconstruction, Phase 1
    LocationLaughlin Air Force Base, Del Rio, TX
    Phase 1 size600 linear feet x 12 feet wide
    Concrete section8-inch thick concrete
    Base materialA2 base material
    Work performedBase material hauling and placement, elevation verification, trimming to final grade, concrete placement
    SettingActive base entrance, phased work with traffic control in place
    StatusIn progress (photos dated October 27, 2026)

    Scope of work

    A2 base material. Base material is hauled in, staged and spread to build a stable, uniform layer under the new concrete. Consistent base thickness is what keeps a roadway slab from settling and cracking under heavy truck traffic.

    Elevation control. Before concrete is placed, grade elevations are checked and marked on the base with green layout paint. The marks in the photos show the depth remaining to the finished surface, so the crew knows exactly how much to remove or add to reach a true 8-inch slab. On this project the base ran 1-1/2 inches high in places and was trimmed back to design grade before the pour.

    Working beside existing infrastructure. The work runs tight against the existing concrete roadway and a concrete drainage channel, so equipment is sized to trim and shape the base without disturbing either.

    Concrete placement. Once the base passes elevation checks, the section is set up and the 8-inch concrete is placed.

    Traffic control and safety. Barrels and a defined work zone separate crews and equipment from live traffic. Ground crews work in high-visibility PPE and hard hats, and a spotter works with the operators during loading.

    Equipment on this project

    • Compact tracked excavator (CAT): trimming, shaping and cleanup against the existing roadway and the drainage channel
    • Wheel loader: loading and moving A2 base material, with a ground spotter directing the work
    • Skid steer with bucket: hauling and spreading material in tight sections of the roadway
    • Hand crews: shovel work, grade checks and layout marking

    What this project shows agencies and prime contractors

    • Our own equipment and crews: excavators, loaders, skid steers, rollers, buggies and trailers, so schedule and quality are in our hands
    • Active-site experience: phased work at a live base entrance with traffic control in place
    • Quality control before concrete: elevation verified and corrected on the base, not after the pour
    • Track record: 28 years of concrete experience, with work for State and Federal offices, H-E-B, Tesla and SpaceX
    • Statewide reach: we install concrete all over Texas, from high-end residential to large commercial, industrial and infrastructure projects

    Project photos

    Frequently asked questions

    Does 1,2,3 Concrete work on military bases and federal sites? Yes. We are currently working on the main commercial entrance road at Laughlin Air Force Base in Del Rio, and we have completed work for State and Federal offices.

    Do you provide your own equipment? Yes. We run our own excavators, loaders, skid steers, rollers, buggies, trailers and crews.

    What concrete thickness is used on this roadway? Thickness is set by the project design. This Laughlin project uses an 8-inch concrete section over A2 base.

    Do you work outside San Antonio? Yes. We install concrete all over Texas.

    Do you do asphalt work? No. We specialize in concrete and concrete demolition.

  • Uresti Tax Office: Sidewalk Remove-and-Replace

    Uresti Tax Office: Sidewalk Remove-and-Replace

    In April 2026 our crew prepped and poured new concrete at the Uresti tax office, a busy public building where people come and go all day.

    LocationSan Antonio, TX
    Pour dateApril 2026
    ScopeDemolition, forming, steel, pour-back

    Scope

    • Saw-cut and break out the failed sidewalk and entry concrete
    • Haul off debris and prep the subgrade
    • Set forms and reinforcing steel
    • Place, finish and cure new concrete

    Public buildings can’t shut down for construction. We sectioned the work so visitors always had a clear, safe way in, and we left the site clean at the end of every shift.

    Government and agency projects are one of our core practice areas. See our public and government capabilities or request a quote for your facility.

    Project photos

  • San Marcos Outlets: Overnight Storefront Walkway Pour

    San Marcos Outlets: Overnight Storefront Walkway Pour

    On January 15, 2026 we poured a section of the covered storefront walkway at the San Marcos outlets. We set steel and placed concrete after hours so the stores could stay open.

    LocationSan Marcos, TX
    Pour dateJanuary 15, 2026
    ScopeCovered storefront walkway, rebar, night pour

    Retail concrete without the disruption

    Outlet centers depend on foot traffic. Night work lets us cut out old concrete, tie a fresh rebar mat and pour under lights, so shoppers find finished, barricaded sections the next morning instead of an active jobsite.

    • Rebar grid tied on chairs for proper cover
    • Concrete placed and screeded under temporary lighting
    • Edges finished tight to storefronts and columns
    • Area protected while it cures

    Planning work at a shopping center or retail property? Send us your scope. Night and weekend schedules are standard for us.

    Project photos

  • Wells Fargo: New Sidewalks and Main-Entrance ADA Ramp

    Wells Fargo: New Sidewalks and Main-Entrance ADA Ramp

    Just before Christmas 2024 we finished new sidewalks and a handicap ramp at the main entrance of a Wells Fargo branch.

    ClientWells Fargo
    CompletedDecember 23, 2024
    ScopeSidewalks, ADA ramp at main entrance

    Getting ADA work right

    Accessible ramps leave little room for error. Slope, cross-slope, landing size and transitions all have to meet ADA requirements, or the work gets torn out and redone. We form and check every ramp before the truck shows up.

    • Remove existing walks at the entrance
    • Form new sidewalks and the ramp to ADA slopes
    • Pour directly from the ready-mix truck
    • Broom finish for slip resistance

    Banks, offices and retail centers call us for ADA upgrades. Request a quote for your property.

    Project photos

  • H-E-B Fuel Station, Georgetown

    H-E-B Fuel Station, Georgetown

    In May 2024 our crew worked at the H-E-B fuel station in Georgetown, Texas.

    ClientH-E-B
    LocationGeorgetown, TX
    DateMay 2024

    Fuel stations are hard on concrete. Loaded tankers, constant traffic and fuel spills call for thick, well-reinforced slabs and tight joint work. Work also has to be phased so pumps stay open to customers.

    We’ve completed flatwork, dock and entry work at H-E-B stores across Texas. See more commercial and retail projects or get a quote.

  • H-E-B Lockhart: Phase 1 Concrete in a Four-Day Window

    H-E-B Lockhart: Phase 1 Concrete in a Four-Day Window

    From January 15 through January 18, 2024, our crews completed Phase 1 of concrete work at H-E-B in Lockhart, Texas: demolition through finished concrete, with the store open the whole time.

    ClientH-E-B
    LocationLockhart, TX
    DatesJanuary 15–18, 2024
    ScopeDemolition, subgrade, steel, concrete placement

    The scope

    • Break out and haul off existing concrete
    • Prepare and compact the subgrade
    • Set forms and tie reinforcing steel
    • Place, finish and cure new concrete

    Working around a live store

    Grocery work runs on the shopper’s schedule. We isolated and sequenced each section so customers and deliveries could keep moving while each area was demolished, poured and cured.

    Planning retail sitework? Request a quote.

    Project photos

  • Placing a Salt-Finish Patio Slab

    Placing a Salt-Finish Patio Slab

    In January 2024 our crew placed a covered patio slab with a salt finish.

    DateJanuary 13, 2024
    FinishSalt finish

    What is a salt finish?

    After the concrete is floated, coarse rock salt is pressed into the surface. Once the concrete sets, the salt is washed away and leaves a pattern of small pits. The result has a soft, speckled texture that grips well underfoot and stays cooler than smooth concrete, which makes it a favorite around patios and pools.

    Interested in decorative finishes for your home? Browse our residential projects or ask for a quote.

    Project photos

  • TxDOT Cotulla: Agency Concrete Pour

    TxDOT Cotulla: Agency Concrete Pour

    On September 21, 2023 we poured concrete for the Texas Department of Transportation in Cotulla.

    AgencyTxDOT
    LocationCotulla, TX
    Pour dateSeptember 21, 2023

    TxDOT work is held to strict specifications. Steel placement, cover, mix design and finishing are all inspected before and during the pour. Our crews have passed TxDOT and third-party inspections on maintenance facility work across the state.

    Read about our TxDOT Sealy project, or send us your bid documents.

    Project photos

  • TxDOT Maintenance Facility: Wash-Out Pit

    TxDOT Maintenance Facility: Wash-Out Pit

    On June 23, 2023 we were formed, tied and ready to pour a wash-out pit at a TxDOT maintenance facility.

    AgencyTxDOT
    Pour dateJune 23, 2023
    StructureWash-out pit

    Wash-out pits take abuse every day from equipment, water and sediment. Walls and slab are reinforced and formed as one system, with careful attention to drainage slopes and joints so the structure holds up for years.

    We build pits, pads and specialty structures for public and industrial clients. Request a quote.

  • CPS Energy Substations: Storage Foundations, Water Pond and Skyline Pours

    CPS Energy Substations: Storage Foundations, Water Pond and Skyline Pours

    Spring 2023 kept our crews busy at CPS Energy substations around San Antonio.

    ClientCPS Energy
    LocationSan Antonio area, TX
    DatesMarch–May 2023
    ScopeStorage foundations, water pond, Skyline substation pours

    Storage foundation

    In March we formed and tied a large storage foundation with heavy rebar mats, then finished it in May. Substation foundations call for exact embed locations and elevations, because equipment arrives pre-built and has to bolt down perfectly.

    Water pond

    We also built a concrete water pond at a substation, with continuous reinforcement and watertight construction.

    Two pours in one day at Skyline

    On May 19, 2023 the crew made two separate pours at the CPS Skyline substation, keeping the job on schedule.

    Utility work is the top tier of our capabilities. See our Seguin and Loop 410 substation work, or request a quote.

    Project photos